My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-19_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-19_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:49 PM
Creation date
9/4/2009 11:25:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
12/19/2007
Doc Name
Adequacy Concerns & Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Regrade Coyote pond <br />........ .. . <br />.:........::.:..:.;..::............. <br />.. <br />HOURLY EQUIPMENT COST <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />Cat D1OR - 10SU (2005) Horsepower : 570 <br />Semi-Universal <br />ROPS Cab <br />Shift basis : 1 per day <br />1-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $97.15 NA <br /> Operating cost/hour : $138.49 100 <br /> Ripper op. cost/hour : $2.34 20 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $270.75 Total fleet cost/hour : $812.26 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 670,000 CCY factor : 1.125 volume : 753,750 LCY <br /> <br />Source of estimated volume :Appendix A Table A-3 <br />Source of estimated swell factor : Caterpillar Handbook Edition 34 <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,243.2 LCY/hr Dozing method : 1.10 (50% sl) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,300 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SUN) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.45 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 3 Dozer(s) <br />Unit cost : $0.487 /LCY Total job cost : $366,791
The URL can be used to link to this page
Your browser does not support the video tag.