My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-19_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-19_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:49 PM
Creation date
9/4/2009 11:25:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
12/19/2007
Doc Name
Adequacy Concerns & Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : RN5 <br />Task description : Backfill G Dip pit <br />. _ ... .............. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11 R - 11 SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2: 1-shank ripper <br />Horsepower: 850 <br />Shift basis : 2 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $107.62 NA <br />Operating cost/hour : $224.59 100 <br />Ripper op. cost/hour : $2.30 15 <br />Operator cost/hour : $32.93 NA <br />Total unit cost/hour : $367.44 Total fleet cost/hour : $1,469.76 <br />........ .. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,576,945 LCY factor : NA volume : 1,576,945 LCY <br />Source of estimated volume :Appendix A Table 1.4-2 <br />Source of estimated swell factor :NA <br /> <br />... <br />HOURLY PRODUCTION <br />Job Condition Correction Factors . <br />Source <br /> Operator skill : 0.85 (user) <br />Average push distance : 191 feet <br />Unadjusted hourly production : 1,564.6 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site altitude <br />5.00 % (neg) <br />7,000 feet <br />Material weight : 2,475 Ibs/LCY <br />Weight description : <br />USER-PROVIDED WEIGHT DATA <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.81 (2 shifts/day) <br />Spoil pile : 1.00 (doz-oc) <br />Push gradient : 1.11 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.93 (user) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.71 <br />Adjusted unit production <br />Adjusted fleet production <br />1116.18 <br />4,464.73 <br />LCY/hr <br />LCY/hr <br />...... <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 353.20 Hours <br />Unit cost : $0.329 /LCY Total job cost : $519,120
The URL can be used to link to this page
Your browser does not support the video tag.