My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-19_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-19_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:49 PM
Creation date
9/4/2009 11:25:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
12/19/2007
Doc Name
Adequacy Concerns & Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $85.09 NA <br /> Operating cost/hour : $224.59 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $33.03 NA <br /> Total unit cost/hour : $342.71 Total fleet cost/hour : $1,370.84 <br /> <br />. . <br />MATERIAL QUANTITIES ... _... ....... . <br />Initial Swell Loose <br />volume : 841,376 LCY factor : NA volume : 841,376 LCY <br /> <br />Source of estimated volume : appendix A, Table 1.4-2 <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.85 (user) <br />Average push distance : 236 feet Material consistency : 1.10 (Cat_HB) <br />Unadjusted hourly production : 1,271.7 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (a vg.) <br />Material consistency description : Job efficiency : 0.79 (3shiRs /day) <br />Partly consolidated stockpile Spoil pile : 1.00 (doz-oc) <br /> Push gradient : 1.41 (Cat HB) <br />Average push gradient : 19.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,400 feet Material weight : 0.93 (user) <br /> Blade type : 1.00 (S/SUN) <br />Material weight : 2,475 Ibs/LCY Net correction : 0.97 <br />Weight description : <br />USER-PROVIDED WEIGHT DATA Adjusted unit production : 1228.03 LCY/hr <br /> Adjusted fleet production : 4,912.11 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) Total job time : 171.29 Hours <br />Unit cost : $0.279 /LCY Total job cost : $234,806 <br />
The URL can be used to link to this page
Your browser does not support the video tag.