My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-19_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2007-12-19_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:19:49 PM
Creation date
9/4/2009 11:25:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
REVISION
Doc Date
12/19/2007
Doc Name
Adequacy Concerns & Cost Estimate
From
DRMS
To
Trapper Mining Inc
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />Permit or other job action : RN5 <br />Task description : backfill & grade additional 13.5 acres Z-dip pit <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat 011 R - 11 SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2: I-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $107.62 NA <br /> Operating cost/hour : $224.59 100 <br /> Ripper op. cost/hour : $2.30 15 <br /> Operator cost/hour : $32.93 NA <br /> Total unit cost/hour : $367.44 Total fleet cost/hour : $1,469.76 <br />..... :. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 875,000 LCY factor : NA volume : 875,000 LCY <br /> <br />Source of estimated volume :Map 10A sheet 3 of 3 <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.83 (user) <br />Average push distance : 150 feet Material consistency : 0.80 (Cat HB) <br />Unadjusted hourly production : 1,933.3 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.81 (2 shifts/day) <br />Rock, well ripped or blasted Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.18 (Cat HB) <br />Average push gradient : 8.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,500 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2650 lbs/LCY Net correction : 0.53 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 4 Dozer(s) <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Horsepower: 850 <br />Shift basis : 2 per day <br />1023.86 LCY/hr <br />4,095.43 LCY/hr <br />213.65 Hours <br />Unit cost : $0.359 /LCY Total job cost : $314,018
The URL can be used to link to this page
Your browser does not support the video tag.