My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-03_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2009-09-03_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:15 PM
Creation date
9/4/2009 11:07:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
9/3/2009
Doc Name
Summary Sheet & Cost Estimate
From
DRMS
To
File
Type & Sequence
RN5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 003 State : Colorado <br />Date : 0910212009 County :Moffat <br />User : JRS Site : Colowyo Mine <br />Agency or organization name : Colorado Division Of Reclamation, <br />Permit or other job action : Permit Renewal 05 <br />Task description :Doze East Pit Highwall <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11 R - 11U (2005) Horsepower : 850 <br />Blade type : Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :1-shank ripper <br />Cost Breakdown : Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />Data source : (CRG) <br />Utilization % <br />$178.51 NA <br />$262.99 100 <br />$14.70 100 <br />$38.54 NA <br />$494.73 Total fleet cost/hour : $1,484.20 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,579,000 LCY factor : NA volume : 1,579,000 LCY <br />Source of estimated volume : Operator Estimate <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job <br />Average push distance : 300 feet <br />Unadjusted hourly production : 1,055.6 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient:- 30.00 % (neg) <br />Average site altitude : 7,400 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth <br />dition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 1.20 (Cat HB) <br />Dozing method : 1.10 (50% sl) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1shift/day) <br />Spoil pile : 1.00 (doz-oc) <br />Push gradient : 1.60 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.79 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 1.04 <br />Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST <br />Fleet size : 3 Dozer(s) <br />Unit cost : $0.449 /LCY <br />And Safety <br />Permit/job# : C-1981-019 <br />Abbreviation : none <br />Filename C019-003 <br />Total job time <br />Total job cost <br />1101.17 LCY/hr <br />3,303.52 LCY/hr <br />477.97 Hours <br />$709,411
The URL can be used to link to this page
Your browser does not support the video tag.