My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-03_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2009-09-03_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:15 PM
Creation date
9/4/2009 11:07:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
9/3/2009
Doc Name
Summary Sheet & Cost Estimate
From
DRMS
To
File
Type & Sequence
RN5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task #: 062 State : Colorado Permit/job #: C-1981-019 <br />Date : 0910212009 County : Moffat Abbreviation :none <br />User: JRS Site : Colowyo Mine Filename : C019-062 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal 05 <br />Task description : Regrade Stoker Ditch <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 320C <br />Horsepower: 138 <br />Weight (MT) : 19.70 <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $26.22 NA Shift basis : 1 per day <br />Operating cost/hour : $42.86 100 Data source : (CRG) <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $107.80 Total fleet cost/hour : $107.80 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,200 LCY factor : NA volume : 2,200 LCY <br />Source of estimated volume: Division Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket swing loaded dump bucket swing empty) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.28 minutes <br />Bucket Capacity <br />Rated bucket capacity <br />Bucket fill factor <br />Adjusted bucket capacity <br />1.63 LCY (heaped) Bucket size class : medium <br />0.85 Hard, tough clay (80% - 90%) <br />1.39 LCY <br />Job Condition Correction Factors <br />Site altitude : 7,400 feet <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) <br />Unit cost : $0.493 per LCY <br /> Source <br />Altitude adjustment : 0.90 I (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.75 multiplier <br />292.71 LCY/hour <br />218.66 LCY/hour <br />218.66 LCY/hour <br />Total job time : 10.06 hours <br />Total job cost : $1,085
The URL can be used to link to this page
Your browser does not support the video tag.