Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 046 State :Colorado Permit/job# :C-1981-019 <br />Date : 0910212009 County:Moffat Abbreviation :none <br />User : JRS Site :Colowyo Mine Filename :C019-046 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Permit Renewal 05 <br />Task description : Regrade Work Area Pond 002A <br />HOURLY EQUIPMENT COST <br />.Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $91.99 NA <br />Operating cost/hour : $164.67 100 <br />Ripper op. cost/hour : $1.10 10 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $296.30 Total fleet cost/hour : $296.30 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 26,000 CCY factor : 1.125 volume : 29,250 LCY <br />Source of estimated volume : Exhibit 7 - Pond As-Build Drawing <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 175 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,074.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-r? <br />Average push gradient : 0.00 % (pos) <br />Average site altitude : 7,000 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.709 /LCY <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.39 <br /> <br />Adjusted unit production : 417.76 LCY/hr <br />Adjusted fleet production : 417.76 LCY/hr <br />Total job time : 70.02 Hours <br />Total job cost : $20,746 <br />