My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-03_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2009-09-03_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:15 PM
Creation date
9/4/2009 11:07:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
9/3/2009
Doc Name
Summary Sheet & Cost Estimate
From
DRMS
To
File
Type & Sequence
RN5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task #: 038 <br />Date : 0910212009 <br />User: JRS <br />State : Colorado <br />County:Moffat <br />Site : Co/owyo Mine <br />Agency or organization name : Colorado Division Of Minerals And Geology <br />Permit or other job action : Permit Renewal 05 <br />Task description : Finish Grade Section 16 Pit <br />HOURLY EQUIPMENT COST <br />Basic machine: CAT 16H <br />Horsepower: 275 <br />Attachment no. 1 : NA Shift basis : 2 per day <br />Attachment no. 2 :Multi-shank ripper <br />Data source : (CRG) <br />Utilization % <br />Cost Breakdown Ownership cost/hour : $36.63 NA <br />Grader operating cost/hour : $76.98 100 <br />Ripper operating cost/hour : $0.00 0 <br />Operator cost/hour : $24.65 NA <br />Total unit cost/hour : $138.26 Total fleet cost/hour : $138.26 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 17.70 acres <br />Source of estimated acreage :Map 23 <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees <br />Effective blade length : 13.90 feet <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 11.90 feet ** <br />Unadjusted hourly unit production : 1.8030 acres/hour <br />Job Condition Correction Factors <br />Average site altitude : 7,400 feet <br />Permit/job # C-1981-019 <br />Abbreviation : none <br />Filename : C019-038 <br />at 0 degrees, blade is perpendicular <br />to direction of travel. <br />.. width of ripper beam on ripping applications <br />Source <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency adjustment factor : 0.80 (2sh1d, mod.) <br />Net job correction : 0.8000 multiplier <br />Adjusted hourly unit production : 1.4424 acres/hour <br />Adjusted hourly fleet production : 1.4424 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time : 12.27 <br />Unit cost : $95.85 per acre Total job cost : $1,697 <br />CIRCES Cost Estimatina Software <br />MOTOR GRADER WORK <br />hours
The URL can be used to link to this page
Your browser does not support the video tag.