My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-03_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2009-09-03_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:15 PM
Creation date
9/4/2009 11:07:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
9/3/2009
Doc Name
Summary Sheet & Cost Estimate
From
DRMS
To
File
Type & Sequence
RN5
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 011 State : Colorado Permit/job# : C-1981-019 <br />Date : 0910212009 County:Moffat Abbreviation :none <br />User : JRS Site :Colowyo Mine Filename :C019-011 <br /> <br />Agency or organization name : Colorado Division Of Minerals And Geology <br />Permit or other job action : Permit Renewal 05 <br />Task description : Grade Gossard Loadout Area <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11 R - 11U (2005) Horsepower : 850 <br />Blade type : Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 2 per day <br />Attachment no. 2 :1-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $110.18 NA <br />Operating cost/hour : $262.99 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.69 NA <br />Total unit cost/hour : $411.86 Total fleet cost/hour : $1,235.57 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 27,000 BCY factor : 1.250 volume : 33,750 LCY <br />Source of estimated volume: Maps 19 and 22A; Division Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Fac <br /> Operator skill <br />Average push distance : 100 feet Material consistency <br />Unadjusted hourly production : 2,870.3 LCY/hr Dozing method <br /> Visibility <br />Material consistency description : Job efficiency <br />Compacted fill or embankment Spoil pile <br /> Push gradient <br />Average push gradient:- 0.00 % (pos) Altitude <br />Average site altitude : 6,500 feet Material weight <br /> Blade type <br />Material weight : 2650 Ibs/LCY Net correction <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST <br />Fleet size : 3 Dozer(s) Total job time <br />Unit cost : $0.420 /LCY Total job cost <br />ors Source <br />0.75 (avg.) <br />0.90 (Cat HB) <br />1.00 (gen.) <br />0.90 (user) <br />0.81 (2 shifts/day) <br />0.80 (fnd-rf) <br />1.00 (Cat HB) <br />1.00 (Cat HB) <br />0.87 (Cat HB) <br />1.00 (S/SU/U) <br />0.34 <br />980.33 LCY/hr <br />2,941.00 LCY/hr <br />11.48 Hours <br />$14,179
The URL can be used to link to this page
Your browser does not support the video tag.