My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-03_REVISION - C1980007 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2009-09-03_REVISION - C1980007 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:15 PM
Creation date
9/4/2009 10:59:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REVISION
Doc Date
9/3/2009
Doc Name
Preliminary Adequacy Review
From
DRMS
To
Mountain Coal Company
Type & Sequence
TR118
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine <br />/ Mine Dewaterinz and Treatment Facilities Description <br />Sylvester Gulch <br />MCC designed and constructed mine dewatering and treatment facilities located within the <br />Sylvester Gulch drainage. The system consists of one 18-inch cased borehole, one 16-inch borehole <br />(completed as a 12-inch cased hole), and two 20-inch cased boreholes, completed during the <br />summer of 1997 to access the operational sump in the northeast comer of the l ONE Tailgate of the <br />B seam. Following the completion of ventilation seals on the IONE and I WE longwall panels, this <br />area became the NE Panels Sealed Sump. MCC utilizes the sealed sump as a large volume mine <br />water storage area and pumps the water out of the mine through one of the boreholes to Sylvester <br />Gulch. The smaller borehole serves as a recirculation loop to the siunp and the two 20-inch cased <br />boreholes serve as alternate recirculation boreholes and/or boreholes for water level indicators. <br />Refer to the Probable Hydrologic Consequences section of the permit for additional discussion of <br />the sumps. <br />The treatment facilities will include a dewatering pump station and treatment building, an aeration <br />pond; and a secondary settling pond. A detailed discussion of each facility is provided in Exhibit 69, <br />Sylvester Gulch Facilities Area. <br />Temporary Bathhouse <br />Facilities necessary to house additional personnel for E Seam construction and development <br />work are planned to be installed near Shaft #1 in Sylvester Gulch in late April and be completed <br />in late May 2005. These facilities will be temporary in nature and designed to be removed when <br />additional staffing is no longer required for E Seam development and construction needs. <br />All construction and installation work will be performed within the existing disturbed areas at the <br />Shafts #1 and 92 area in Sylvester Gulch. There are no plans to change any existing sediment <br />controls, ditches or roads. Surfaces will be restored to the existing compacted roadbase when <br />excavations for conduits and piping are completed. <br />All equipment and facilities will be placed on the existing surfaces with no concrete foundations <br />anticipated except for the two electrical transformers required for the facility. These will require <br />a single reinforced concrete slab on grade expected to be approximately 8 feet wide by 12 feet <br />long. This slab will also be removed when additional staffing is no longer required. <br />Potable water will be supplied using a 10,000 gallon surface tank and pressure pump system. <br />This tank will be supplied with potable water from WEM's existing potable water treatment and <br />storage system via truck haul to Sylvester Gulch. <br />2.05-22 Rev. 06105- PRIG. 01/06- PRIG; 03106-PRIG; 04106- PRIO, 05106- PRIO; 01109-AIR-350, 04109- TRIM 04109- MR353
The URL can be used to link to this page
Your browser does not support the video tag.