My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-03_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2009-09-03_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:15 PM
Creation date
9/4/2009 10:58:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
9/3/2009
Doc Name
Adequacy Concerns & Attached Cost Estimate
From
DRMS
To
Twentymile Coal Company
Type & Sequence
TR69
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinci Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 69d State :Colorado Permit/job# :C1982-056 <br />Date : 0910212009 County : Routt Abbreviation :none <br />User : JHB Site :Foidel Creek Mine Filename C056-69d <br />Agency or organization name : Division Of Reclamation, Mining And Safety <br />Permit or other job action : TR69 <br />Task description :replace topsoil on 6RT borehole pad, light use road & pipeline corridor <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11 - 7SU Horsepower : 240 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2 :NA <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $41.01 NA <br />Operating cost/hour : $67.68 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $147.23 Total fleet cost/hour : $147.23 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 4,638 LCY factor : NA volume : 4,638 LCY <br />Source of estimated volume : Calc. 5.75 ac. x 0.5 ft. thick <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,022.9 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth - Dry packed <br />0.00 % (pos) <br />6,700 feet <br />2,550 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.291 /LCY <br />dition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 1.10 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (1shift1da) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.49 <br />Adjusted unit production : 505.23 LCY/hr <br />Adjusted fleet production : 505.23 LCY/hr <br />Total job time : 9.18 Hours <br />Total job cost : $1,352
The URL can be used to link to this page
Your browser does not support the video tag.