My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-03_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2009-09-03_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:15 PM
Creation date
9/4/2009 10:58:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
9/3/2009
Doc Name
Adequacy Concerns & Attached Cost Estimate
From
DRMS
To
Twentymile Coal Company
Type & Sequence
TR69
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $11.54 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Dozer and ROPS : $11.54 NA NA $4.56 $8.80 $5.62 $8.53 NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $18.97 $8.63 $13.41 NA NA NA NA NA NA NA NA <br />Double shifts : $14.23 $4.31 $6.71 NA NA NA NA NA NA NA NA <br />Triple shifts : $12.65 $2.87 $4.47 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $2.66 NA $3.28 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA $37.07 $5.92 $0.00 $1.42 <br />Attachment no. 2: NA NA NA NA NA NA NA $0.00 $0.00 $0.00 $0.00 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Part s Fuel <br /> <br />Lube Tires <br /> <br />G.E.C. <br />Dozer, ROPS and Attachment no. 2: Dozer and ROPS <br />Single shifts : $18.97 $8.63 $13.41 $2.66 $8.80 $3.28 $8.53 $37.07 $5.92 $0.00 $1.42 <br />Double shifts : $14.23 $4.31 $6.71 ttachment no. 2: <br />Triple shifts : $12.65 $2.87 $4.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br /> <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day : $0.00 Two shift per day average $0.15 <br />Dozer operator (-70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Swing : $0.30 Three shift per day average 25 <br />fl. <br />Mechanic $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $41.01 $67.68 $0.00 $38.54 $147.23 <br />Double shifts : $25.25 $67.68 $0.00 $38.69 $131.62 <br />Triple shifts : $19.99 $67.68 $0.00 $38.79 $126.46 <br />EQUIPMENT PERFORMANCE DATA <br />Description Horsepower <br />(FHP) _Transmission <br />Type Weight <br />(UST) Length <br />(ft) Width <br />(ft) Height_ <br />(ft) _ _Fuel . <br />type Ripper <br />type <br />Dozer : Cat D7R DS Series 11- 7S 240 NA 27.3 19.8 8.3 11.6 diesel NA <br />Blade : Semi-Universal NA NA 4.0 NA 12.1 5.0 NA NA <br />Attachment no. 1 : ROPS Cab NA NA NA NA NA NA NA NA <br />Attachment no. 2 : NA NA NA NA NA NA NA NA NA <br />Total weight :1 31.3 (UST)
The URL can be used to link to this page
Your browser does not support the video tag.