Laserfiche WebLink
All portions of the entrance road are located outside the Minerals permit boundary and entirely within the Coal permit <br />boundary. Permitting for the culvert should occur through the Coal program. However, the culvert will convey drainage <br />from Minerals and Coal reclaimed lands. Therefore, the Minerals Operator was receptive to cost sharing the culvert <br />installation. <br />Wally