ame <br />Earth 8 Environmental <br />E) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />F) Material Processing <br />1) South Cresson Clay Processing Area <br />Soil Liner Fill production for the VLF continued at the South Cresson Clay Processing area. <br />Location This Week <br />tons Cumulative <br />tons Comments <br />So Cresson Clay Processing 19,232 38,131 <br />Squaw Gulch Processin - 35,816 Produced and stockpiled <br />Total 19,232 73,947 <br />G) Miscellaneous <br />No work performed during week. <br />III) Underground Working <br />A) Drilling <br />No work performed during the week. <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. <br />V) VLF Geosynthetics <br />The Geogrid was relocated to Ames lay-down yard. No damage was observed. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed placement of structural fill at the PSSA haul road between stations K1+00 (+/-) and <br />K8+50 (+/-), right and left of centerline, 0-40-feet. <br />Sheet 3 of 6 <br />VLF Weekly Report WE 05.16.09.D.doc