2009-09-03_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-09-03_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:22 PM
Creation date
9/4/2009 7:48:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
9/3/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports- Weeks of 05/10/09 and 05/17/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame <br />Earth 8 Environmental <br />LOB EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 Project No.: 84201125EO <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ LOB <br />Contractor: Ames Construction Co. Inc. <br />Shift: Day/Night <br />Date: May 23, 2009 <br />Reporting Period: 05/17/09 through 05/23/09 <br />Days S M T W T F S <br />Work Shifts D D D D D - <br /> - N N N - - - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range: Lows: 41 °F to 56°F (+/-) Highs 55°F to 85°F (+/-) <br />AMEC: CQA Personnel On-site through the Reporting Period (See Attachment A): <br />AMES: Weather delays due to rain on Thursday and Friday delayed the construction of MSE Wall #2 and <br />Transfer Station #5 retaining wall backfill. Significant delays occurred both days after the rain <br />began. Only tracked equipment continued to work through the rain showers. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />I) EARTHWORK <br />A) Overburden to Stockpile <br />1) LOB Delivery Road <br />Overburden excavation continued through the week between stations 23+00 (+/-) and 29+00 <br />(+/-) and stations 1+00 (+/-) and 3+00 (+/-). Unsuitable material was transported to the Joe <br />Dandy Main Cresson backfill using Cat 777, and 40-Ton articulating haul trucks. A Komatsu <br />800 excavator and a CAT 875 track excavator loaded the haulage equipment, aided by a Cat D- <br />10 dozer and D-9 dozer. (Double shift work) <br />The CAT 345 Excavator performed rock scaling on the LOB Delivery Road uphill cut slope <br />between stations 12+00 (+/-) to 18+00 (+/-). <br />Excavated material from the slope was stockpiled on the roadway for future haul to the <br />designated area. <br />Rockbreakers drilled shot holes on the LOB Delivery Road cut between stations 0+75 (+/-) to <br />2+00 (+/-). The shot, early in the week encompassed the full width of the road. Rockbreakers <br />used between one and four Tamrock track mounted drill rigs. <br />Sheet 1 of 9 <br />LOB Weekly Report WE 05.23.09.1)