Laserfiche WebLink
Centennial Project - Section 33 Pumping Test Plan 10 <br />September 2009 Powertech (USA) Inc. <br />order to demonstrate that any potential radiation dose from the planned pump test is <br />. negligible, Powertech will perform radiological monitoring at the pump test sites. <br />Prior to beginning the aquifer pump test, radon monitoring stations will be deployed to <br />collect background radon emission levels at and around the location of the pump test <br />and the Baker Tanks. Background radon detectors will be collected and analyzed prior <br />to beginning the pump test and re-injection. The radon monitoring stations will have <br />new radon detectors installed in order to collect information on radon emission levels <br />during the pump test and re-injection process. Also during the scheduled monitoring <br />intervals listed above, gross gamma emission monitoring will take place. Gamma <br />emission levels will be taken using a passive integrated hand-held device that has been <br />properly calibrated. <br />Throughout the duration of all operations, personal radiation exposure levels will be <br />monitored for all personnel onsite. All personnel will be required to wear a personal <br />thermo-luminescent dosimeter badge anytime they enter an area where operations are <br />taking place. <br />9.0 REFERENCES CITED <br />Powertech (USA), Inc., nd. Centennial Stratigraphy. Generalized Stratigraphic <br />Description and Cross Section A-A', Section 33, T1 ON, R67W. <br />• Voss, W. Cary, and Daniel E. Gorski, 2007 <br />County, Colorado. Report prepared <br />BC, 41 pp. <br />. Report on the Centennial Project, Weld <br />for Powertech Uranium Corp., Vancouver, <br />0 <br />AMM