My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-02_REVISION - C1980005
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2009-09-02_REVISION - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:13 PM
Creation date
9/3/2009 10:12:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
REVISION
Doc Date
9/2/2009
Doc Name
Reclamaton Revised Cost Estimate
From
Susan Burgmaier
To
Dan Mathews
Type & Sequence
SL4
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $12.66 NA NA NA NA NA NA NA NA NA NA <br />Economic life -Grader and ROPS : $12.66 NA NA $3.82 $8.06 $3.18 $7.81 NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.04 $0.66 $0.85 $0.97 NA NA NA NA <br />Annual usage : $19.10 $9.95 $16.29 NA NA NA NA NA NA NA NA <br />Double shifts : $14.33 $4.98 $8.15 NA NA NA NA NA NA NA NA <br />Triple shifts : $12.74 $3.32 $5.43 NA NA NA NA NA NA NA NA <br />Mechanic labor-Grader and ROPS : NA NA NA $2.23 NA $1.86 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.02 NA $0.50 NA NA NA NA NA <br />Fuel/lube -Grader and ROPS : NA NA NA NA NA NA NA $27.88 $5.48 $4.97 $0.64 <br />Attachment no. 2 : NA NA NA NA NA NA NA $0.00 $0.18 $0.00 $0.81 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Grader, ROPS and Attachment no. 2: Motor Grader and ROPS : <br />Single shifts : $19.10 $9.95 $16.29 $2.23 $8.06 $1.86 $7.81 $27.88 $5.48 $4.97 $0.64 <br />Double shifts : $14.33 $4.98 $8.15 ttachment no. 2 <br />Triple shifts : $12.74 $3.32 $5.43 $0.02 $0.66 $0.50 $0.97 $0.00 $0.18 $0700 $0.81 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Grader - rough blade $16.39 $4.20 $1.25 $1.02 $1.64 $24.50 Day : $0.00 Two shift per day average : $0.15 <br />Grader - finish blade $16.39 $4.20 $1.25 $1.02 $1.64 $24.50 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 Night: . $0.45 <br />HOURLY EQUIPMENT COST SUMMA <br />RY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $45.35 $58.93 $3.14 $24.50 $131.92 <br />- ------Double-shifts-: -- - $27.45- - - - $58.93----- - - - -- - -$3:14-- -- -- - -$24.65- ---- -- -- --$114.17 <br />Triple shifts : $21.48 $58.93 $3.14 $24.75 $108.30 <br /> <br />EQUIPMENT PERFORMANCE DATA Horsepower Transmission Weight Length Width Height Fuel Min. turning Ripper <br /> Description (FHP) type (UST) (ft) (ft) (ft)' type circle (ft) type <br />Motor grader : CAT 14H 215 NA 20.7 35.0 9.2 10.9 Diesel 51.84 NA <br />Attachment no. 1 : Moldboard (blade) NA NA NA NA 14.0 2.2 NA NA NA <br />Attachment no. 2 : Multi-shank ripper NA NA 1.9 NA 8.5 1.3 NA NA Parallelogram <br /> Total weight : 22.6 (UST) ' for ripper, maximum ripping depth <br /> Ground speeds (mph) at rated engine RPM <br /> Transmission Gear: 1st 2nd 3rd 4th 5th 6th 7th 8th <br /> forward : 2.3 3.3 4.4 6.4 9.6 13.5 18.3 26.5 <br /> reverse : 2.6 3.6 4.9 7.1 10.7 15.0 20.3 29.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.