My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-02_REVISION - C1980005
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2009-09-02_REVISION - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:13 PM
Creation date
9/3/2009 10:12:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
REVISION
Doc Date
9/2/2009
Doc Name
Reclamaton Revised Cost Estimate
From
Susan Burgmaier
To
Dan Mathews
Type & Sequence
SL4
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $20.79 NA NA NA NA NA NA NA NA NA NA <br />Economic life - Loader and ROPS : $20.79 NA NA $5.30 $7.14 $6.47 $7.88 NA NA NA NA <br />- Attachment No. 2 : NA NA NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $30.38 $14.03 $17.93 NA NA NA NA NA NA NA NA <br />Double shifts : $22.79 $7.02 $8.97 NA NA NA NA NA NA NA NA <br />Triple shifts : $20.27 $4.67 $5.97 NA NA NA NA NA NA NA NA <br />Mechanic Labor - Loader and ROPS : NA NA NA $3.09 NA $3.78 NA NA NA NA NA <br />Attachment No. 2 : NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/lube - loader : NA NA NA NA NA NA NA $60.19 $10.07 $11.30 $0.97 <br />Attachment No. 2 : NA NA NA NA NA NA NA $0.00 $0.00 $0.00 $0.00 <br />ADJUSTED COST SUBTOTALS Ownership Costs Overhaul and Operating Costs <br />Overhaul Field Repair <br />Depreciation CFC Overhead Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Loader, ROPS and Attachments : Loader and ROPS : <br />Single shifts : $30.38 $14.03 $17.93 $3.09 $7.14 $3.78 $7.88 $60.19 $10.07 $11.30 $0.97 <br />Double shifts : $22.79 $7.02 $8.97 ttachment no. 2 : <br />Triple shifts : <br />HOURLY OPERATOR WAGES $20.27 $4.67 $5.97 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br />Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Loader operator (<=6cy $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day : $0.00 Two shift per day average : $0.15 <br />Loader operator (> 6cy $23.82 $9.22 $1.82 $1.48 $2.38 $38.72 Swing : $0.30 Three shift per day average : $0.25 <br />Mechani $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 Night: $0.45 <br />HOURLY EQUIPMENT COST SUMMA <br />SUMMARY Ownership Operating and Overhaul Operator Total <br />IUIPMENT PERFORMANCE DATA <br /> Machine Attachments Cost/hr ($) <br />Single shifts : $62.35 $104.42 $0.00 $38.72 $205.49 <br />Double.shifts-: -----$38.77-------- -----$104.42----- $0.00- ----$38.87-- --------- ------$18206---- <br />Triple shifts : $30.91 $104.42 $0.00 $38.97 $174.30 <br />Machine description Transmission type Fuel type <br />CAT 988G (2005) NA Diesel <br /> Minimum <br /> turning <br />Bucket type circle (ft.) <br />Loader bucket : Straight rock4eeth/seg. 57.33 <br />Ground speeds (fpm) at rated engine RPM <br />Transmission gear : 1 st <br />forward : 370 <br />reverse : 422 <br /> <br /> <br />Horsepower <br />(fhp) Machine <br />length <br />(ft) Machine <br />width <br />(ft) Machine <br />height <br />(ft) Machine <br />weight <br />(UST) <br />475.0 40.17 12.50 13.58 55.05 <br />Struck <br />capacity <br />(cy) Heaped <br />capacity <br />(cy) Maximum <br />loading <br />height (ft.) Basic <br />cycle time <br />(min.) <br />6.80 8.20 13.67 0.6 <br />2nd 3rd 4th <br />651 1,126 1,936 <br />739 1,285 NA
The URL can be used to link to this page
Your browser does not support the video tag.