Laserfiche WebLink
I <br />sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : CDRMS <br />Task #: 112 State : Colorado Permit/job #: C-1980-005 <br />Date : 0910112009 County :Routt Abbreviation :none <br />User: SLB Site : Seneca li Mine Filename :0005-112 <br />Permit or other job action : S104 Phase / Release <br />Task description : Topsoil on 36 ac BRB-3, all BRB-4, and all BRB-5 <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Equipment Description <br />Scraper work team -Schaper : Cat 637G w/push-pull <br />-Push dozer: NA <br />Support equipment -Load area :NA <br />-Dump; area :NA <br />Road maintenance -Motor grader : CAT 14H <br />-Water,truck :Water Tanker, 5,000 Gal. <br />Cost Br( <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA grader misctruk <br />% Utilization-machine : 100 NA NA NA 25 25 <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $108.62 NA NA NA $41.72 $22.75 <br />Operating cost/hour : $220.32 NA NA NA $14.73 $11.05 <br />Ripper op. cost/hour : NA NA NA NA $0.00 NA <br />Operator cost/hour : $24.98 NA NA NA $24.50 $38.70 <br />Unit subtotals : $353.92 NA NA NA $80.95 $72.50 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,415.69 Support: $0.00 Maintenance : $153.45 <br />Total work team cost/hour : $1,569.15 <br />f <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 914,397 CCY I factor : 1.102 volume : 1,007,665 LCY <br />i <br />Source of quantity take-off :9" replaced on 755.7 acres <br />Source of estimated swell factor : SCC Tasks