Laserfiche WebLink
i <br />i <br />Task # 085 Pond Dredging August 25, 2009 <br />Seneca II Mine C-1980-005 <br />SL-4 - Phase I Bond Release <br />Dredge Ponds 004 and 008 during; liability period. <br />Based on SCC estimate. <br />Assume 16 ac. ft. (25,800 c.y.) one time <br />Mob/Demob 1.00 $6,375.00 $6,375.00 <br />Pumping 25,800.00 $5.92 $152,736.00 <br />Total $159,111.00