Laserfiche WebLink
'CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name: CDRMS <br />Task # : 084 State : Colorado <br />Date : 0910112009 County :Routt <br />User : SLB Site : Seneca li Mine <br />Permit or other job action : S104 - Phase 1 Release <br />Task description :Mobilize equipment for reclamation <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />' Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series It - 8SU (20 51.68 $48.29 $125.45 1 $173.74 $125.45 $0.00 <br />-Cat 637G w/push-pull 59.08 $108.62 $125.45 4 $936.27 $501.80 $0.00 <br />-Cat 769D 37.54 $52.98 $117.55 4 $682.14 $470.20 $0.00 <br />-CAT 988G (2005) 55.05 $62.35 $125.45 1 $187.80 $125.45 $0.00 <br />-CAT 14H 20.70 $41.81 $88.67 1 $130.48 $88.67 $0.00 <br />-Revegetation Equipment 20.00 1$65.00 $88.67 1 $153.67 $88.67 $0.00 <br />-Water Tanker, 5,000 Gal. 15.00 i $22.75 $88.67 1 $111.42 $88.67 $0.00 <br /> <br /> <br /> <br /> i <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $2,375.53 $1,488.91 $0.00 <br />sheet 1 of 2 <br />Permit/job #: C-1980-005 <br />Abbreviation :none <br />Filename :0005-084