Laserfiche WebLink
EMERGENCY SPILLWAY <br />1). Does it appear that the emergency spillway has discharged water since the last inspection? y <br />Yes No <br />2). Is erosion occurring at any section of the emergency spillway? !/' <br />Yes No <br />Describe extent: <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design moorage Capacity Of the reservoir been surpassed? <br />Yes No .L/ <br />Explain: <br />OTHER OBSERVATIONS f? <br />all <br />`1 d'?i ?-S yYt it Gut/ Gs%'Ct <br />16 e S: <br />v <br />MSHA Qualified Impoundment I spector <br />/ g10? <br />Date <br /> <br />Page 2 of 2