Colowyo C-1981-019 <br /> 18 August 2009 <br /> Pg 9/ <br /> Revegetation/Reclamation Success (cont.): - The East Pit reclamation was walked <br /> from the Prospect Ditch to approximately the Gulch A ditch. The vegetation in this <br /> area is very thick, with the Great Basin Wild Rye being over seven feet tall this year. <br /> The one problem that was noted was there were a large number of bull and musk <br /> (and possible wavy-leaf) thistle in the area. Most of the thistles noted were single <br /> plants. Colowyo had indicated that they just completed spraying last month prior to <br /> our inspection (14 July 2009) but they either missed these plants or they emerged <br /> late. Unfortunately most of the plants have already gone to seed. The Division <br /> recommends that Colowyo spray these areas again this fall to help control their <br /> spread next year. Colowyo will need to conduct an intensive survey of their weeds <br /> next year as well, and spray as necessary to get them back under control. The <br /> remaining Gulch A watershed and the Streeter Gulch watershed will be walked next <br /> month and reported at that time. *See pictures at the end of this inspection for <br /> pictures of the Gulch A reclamation.* <br /> Highwall Mining: - Currently Colowyo had ICG on site performing highwall mining. <br /> The highwall mining was taking place in the E2-Seam in the Taylor Draw area of the <br /> South Taylor Pit. They were moving the highwall miner to the next hole location at the <br /> time of the inspection. There were four holes currently open while all of the rest have <br /> been filled (as required by the permit). There is a large stockpile of coal behind the <br /> highwall miner that Colowyo will move out at some point (they are mining from south <br /> to north). ICG will be underming the ready line for the South Taylor Pit. Although <br /> Colowyo's highwall mining plan is designed for zero subsidence, Colowyo is taking <br /> extra precautions in this area. In the first hole under the ready line, Colowyo is having <br /> ICG mine the entire depth possible. After leaving a pillar (based on their design), <br /> they are only mining the next hole to within 100 feet of the ready line. Based on this <br /> plan Colowyo is only mining every other hole under the ready line. This area is <br /> constructed on fill and it is constantly monitored by Colowyo. Any subsidence will be <br /> immediately fixed. *See pictures at the end of this inspection report for the ICG <br /> highwall mining area.* <br /> Availability of Records: - All of the necessary records were available in the record <br /> room in the office building. See the Availability of Records form at the end of this <br /> inspection. <br /> This completes the 18 August 2009 inspection report for the Colowyo Mine. <br />