Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />001 State : Colorado Permit/job # : C-1981-010 <br />0811412009 County :Moffat Abbreviation :none _ <br />JDM Site : Trapper Mine Filename : C010-001 <br />Permit or other job action : Tr105 <br />Task description :Replace Topsoil at Horse Gulch Area - 59 acres <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Cost Bre <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area :Cat D10R - 10SU (2005) <br />-Dump area : Cat D10R - 10SU (2005) <br />Road maintenance -Motor grader : CAT 16H _ <br />-Water truck : Water Tanker, 2, 500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer dozer grader misctruk <br />% Utilization-machine : 100 NA 100 100 100 50 _ <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $110.37 NA $84.86 $84.86 $56.65 $7.53 <br />Operating cost/hour : $177.86 NA $138.49 $138.49 $63.52 $7.73 _ <br />Ripper op. cost/hour : NA NA $0.00 $0.00 $0.00 NA <br />Operator cost/hour : $24.95 NA $32.78 $32.78 $24.47 $33.94 <br />Unit subtotals : $313.18 NA $256.13 $256.13 $144.63 $49.20 <br />Number of units : 8 0 1 1 1 1 <br />Group subtotals : Work : $2,505.41 Support : $512.26 Maintenance : $193.84 <br />Total work team cost/hour : $3,211.51 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 77,712 BCY factor : 1.429 volume : 111,050 LCY <br />Source of quantity take-off :Appendix A TR105 <br />Source of estimated swell factor : CAT