Laserfiche WebLink
<br />ASPHALT r' <br />SPECIALTIES CO. <br />10100 Dallas St. Henderson, CO 80640 • <br />August 21, 2009 <br />Mr. David Bird <br />'Reclamation Specialist <br />Colorado Div. of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Dear Mr. Bird: <br />(303) 289-8555 Fax: (303) 289-7707 <br />Y man A(? v <br />l/ A'UG <br />Viviisiortui r1v':,x,<<1CRUGt4, <br />dining and Safety <br />Enclosed, please find a set of DRAFT plans for the required Speer Mining Resource <br />perimeter drain. Submittal of this set of plans is in response to the MLRB Board Order MV- <br />2009-016. This set of plans is for your review and approval. ASCI has reviewed the plans <br />and feels that the design is buildable. Deere and Ault Consultants, Inc. has designed the <br />drain system based on their experience with similar situations and designs and will P.E. <br />stamp the final design, provided that there are no significant changes, once it has been <br />approved by the DBMS. <br />By submittal of this design for a long-term perimeter drain at the Speer site, and subsequent <br />construction and operation of the perimeter drain (should it be required), all corrective <br />actions of Board Order MV-2009-016 will have been satisfied. <br />Thank you for your attention to this matter and for your timely review on the submitted <br />plans. <br />Sincerely, <br />Rob Laird <br />Land Manager <br />enclosure <br />cc: Dan Hunt <br />Deere and Ault Consultants, Inc. <br />file