My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-27_REVISION - M1994097
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994097
>
2009-08-27_REVISION - M1994097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:39:03 PM
Creation date
8/27/2009 1:12:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994097
IBM Index Class Name
REVISION
Doc Date
8/27/2009
Doc Name
Amendment Application (AM-03)
From
Oldcastle SW Group, Inc. dba United Companies
To
DRMS
Type & Sequence
AM3
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COSTS <br />The following is an estimate of the reclamation costs, calculated on a per acre basis, <br />which are limited to site contouring, overburden and topsoil placement, and re-vegetation <br />activities. <br />SHAPING <br />Motorgrader $138.00 /hour <br />Loader $116.00 /hour <br />Heavy Equipment Operator $42.00 /hour <br />Laborer $34.00 /hour <br />Assume one-eight hour day to shape one acre <br />SHAPING ESTIMATED TOTAL $2640.00 /acre <br />TOPSOIL AND OVERBURDEN PLACEMENT <br />Motorgrader $138.00 /hour <br />Loader $116.00 /hour <br />Heavy Equipment Operator $42.00 /hour <br />Laborer $34.00 /hour <br />Assume one-eight hour day to shape one acre <br />TOPSOIL / OVERBURDEN ESTIMATED TOTAL $2640.00 /acre <br />RE-VEGETATION <br />Hydro-seed $300.00 /acre <br />Straw mulch $750.00 /acre <br />Tacifier $250.00 /acre <br />RE-VEGETATION ESTIMATED TOTAL $1300.00 /acre <br />ESTIMATED RECLAMATION COST PER ACRE <br />$6,580 /acre
The URL can be used to link to this page
Your browser does not support the video tag.