My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-25_PERMIT FILE - M2009070
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009070
>
2009-08-25_PERMIT FILE - M2009070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:02 PM
Creation date
8/27/2009 7:38:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009070
IBM Index Class Name
PERMIT FILE
Doc Date
8/25/2009
Doc Name
New 112c Appl
From
Yuma County
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
windmill. By using these buffer areas, no damage should occur to the existing <br />perimeter fence nor the stock well. <br />1) Dust control measures will be utilized, as necessary, on Co. Rd. QQ and <br />internal pit roads. Water will be purchased from commercial wells in the area <br />as available. The possibility exists for establishment of a commercial well on <br />the site at a later date. Until that occurs, water will be purchased as needed <br />and where available. <br />EXHIBIT E - Reclamation Plan <br />The pit will be re-seeded, as recommended by the attached Yuma County NRCS seeding <br />recommendation, when completed. The site will be used for rangeland. Each of the <br />areas will be re-seeded after mining has been completed in that area. <br />a) The stockpiled overburden will be spread over the mined area. The <br />overburden will be spread out to maintain a 3:1 slope is established on the <br />sidewalls. <br />b) The stockpiled topsoil will be spread evenly over the prepared area. All <br />topsoil will be replaced before seeding of the pit occurs. We estimate that <br />approximately one foot of topsoil will be replaced during reclamation. All of <br />the stockpiled topsoil will be returned, but the depth could vary depending on <br />what was stockpiled in that particular area. <br />c) Slopes no greater than 3:1 will be left in the completed pit. <br />d) Any internal haul roads will be reclaimed as the pit is closed. The entrances <br />into the pit will be left in place at the request of the landowner.
The URL can be used to link to this page
Your browser does not support the video tag.