My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-21_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2009-08-21_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:54:59 PM
Creation date
8/26/2009 1:17:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
REVISION
Doc Date
8/21/2009
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
New Horizon
Type & Sequence
RN5
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Although the currently approved postmining land use map (Exhibit 2.05.4-5, certified <br />2/7/2000), shows the entirety of the Morgan property would be irrigated under the <br />reclamation plan, WFC has indicated in discussions and correspondence that they intend <br />to submit a revised plan that would provide for irrigation during the liability period, of <br />only that portion of the Morgan property that WFC believes can be adequately irrigated <br />with the water rights available. The Division notes that Rule 4.25.2(3) requires that <br />revegetation success on Prime Farmlands be measured on the basis of crop production, <br />Rule 4.25.2(4) requires that the aggregate total Prime Farmland acreage shall not be <br />decreased from that which existed prior to mining, and Rule 4.25.5(2) requires that, <br />within 10 years after completion of backfilling and grading, Prime Farmland must be <br />used for crops commonly grown on surrounding Prime Farmland. <br />Due to certain inconsistencies between reclamation plan text and the postmining land use <br />man iii regard cuto Ene oSU111 iI ianu use ueJI .lorl IVr `llle Al ?dI3 IU ell ailU III <br />r p gnat g" p" p y, <br />order to clarify the applicable reclamation requirements, the following stipulation is <br />imposed: <br />STIPULATION 17 <br />UNLESS THE PERMITTEE DEMONSTRATES THAT SOME PORTION OF <br />THE 107.96 ACRE AREA OF PRESUMED PRIME FARMLAND ON THE <br />MORGAN PROPERTY WITHIN THE PERMIT AREA DOES NOT MEET <br />PRIME FARMLAND CRITERIA BASED ON ONE OR MORE OF THE <br />FACTORS LISTED IN RULE 2.04.12, THE ENTIRE 107.96 ACRE AREA IS <br />CONSIDERED PRIME FARMLAND IN ACCORDANCE WITH DRMS <br />REGULATIONS, AND WILL BE RECLAIMED AS IRRIGATED CROPLAND IN <br />ACCORDANCE WITH THE REQUIREMENTS OF RULE 4.25. <br />48
The URL can be used to link to this page
Your browser does not support the video tag.