Laserfiche WebLink
-4- <br />12. Primarv future (Post-minine) land use (check one): <br />® Cropland(CR) F1 Pastureland(PL) _® General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) P Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br />Developed Water Resources(WR) F Solid Waste Disposal(WD) <br />13. Primary resent land use check one : <br />C1 Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />F-11 Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />6 I Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br />Lj Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dozer and front end loaders remove material and take to plant. <br />15. On Site Processing: F6-'] Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Material is process into roadbase material for use on county roads using crushers and screen plant. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s).