My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-05-08_REVISION - C1981018 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2008-05-08_REVISION - C1981018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:31:19 PM
Creation date
8/25/2009 1:32:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
5/8/2008
Doc Name
Decision Letter & Form
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR134
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br />? a <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />May 8, 2008 <br />Scott Wandstedt <br />Blue Mountain Energy, Inc <br />3607 CR 65 <br />Rangely, CO 81648 <br />Re: Deserado Mine (Permit No. C-1981-018) <br />Decision - Minor Revision No. 134 (MR-134) <br />Addition of Return Shaft RS-4 and Relocation of LWB10-1 <br />Dear Mr. Wandstedt: <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />The Division of Division of Reclamation, Mining and Safety found your application for Minor Revision <br />No. 134 to be complete on May 8, 2008, and issued the decision on the same date. The Decision Form is <br />enclosed. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed decision form. If the amount of Bond Held <br />equals or exceeds the Revised Liability, you need not submit additional bond. However, if the Revised <br />Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that equals <br />or exceeds the Revised Liability. This Minor Revision must not be implemented until any required <br />increase in bond is submitted to and approved by the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />Jason D. u <br />Environmental Protection Specialist <br />JDM/Ahd <br />Enclosure <br />cc: Carl Johnston, Office of Surface Mining, with enclosures <br />STATE OF COLORADO <br />M:\OSS\ahd\temp\C-MR-06 C1981018 1DM 05082008094632 docCarl Johnston <br />Office of Office of <br />Mined Reclamation Denver Grand Junction Durango Active and Inactive Mine
The URL can be used to link to this page
Your browser does not support the video tag.