2008-03-12_REVISION - C1981018 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2008-03-12_REVISION - C1981018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:56 PM
Creation date
8/25/2009 1:30:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
3/12/2008
Doc Name
Reclamation Cost Summary & Estimate
From
DRMS
To
File
Type & Sequence
MR133
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : MR-133 <br />Task description :Regrade 18 N-injec. drillpads and 11,900 ft. of roads (approved MR-133) <br />HOURLY <. EQUIPMENT ;:.... . <br />COST.. <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Horsepower: 405 <br />Shift basis :-1 per day <br /> Data source: <br />(CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $207.53 Total fleet cost/hour : $830.14 <br />MATERIAL AN :::::...................... <br />QU TITIES ............................................................ ................................................................. .............................. .............................. <br />Initial Swell Loose <br />volume : 22,103 CCY factor : 1.215 volume : 26,855 LCY <br /> <br />Source of estimated volume :13.7 acres X 1-foot thick <br />Source of estimated swell factor :DRMS estimate <br />. <br />:: ;>: ` :::::.:......__ ..... <br />ODU'CTION <br />HOURLY PR ........_............._......... __..._................ _ ..... <br /> <br />Job Condition Correction Factors <br /> <br />:.:;Source::::::. <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 2,110.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Consolidated stockpile Spoil pile : 0.80 (find-if) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient: - 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,800 feet Material weight : 1.44 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 1,600 Ibs/LCY Net correction : 0.72 <br />Weight description <br />Top Soil Adjusted unit production : 1510.31 LCY/hr <br /> Adjusted fleet production : 6,041.23 LCY/hr <br /> <br />.:'::.:: :::::::............. <br /> <br />OST <br />JOB TIME AND C ............................................................ ................................................................. .............................. . <br />............................ <br />Fleet size : 4 Dozer(s) Total job time : 4.45 Hours <br />Unit cost : $0.137 /LCY Total job cost : $3,690 <br />
The URL can be used to link to this page
Your browser does not support the video tag.