Laserfiche WebLink
BOREHOLE SEALING WORK <br />Task u: MR-133a <br />Mine: Deserado Mine <br />Permit no.: C-80-007 <br />Permitting action: MR-133 <br />Date: 3/11/08 <br />User: TAK <br /> Cwt of bulk cement Water <br />Hole Plug Plug (assuming 94lbs of Cement cost <br />cement <br />1 <br />18 <br />f <br />T Total rig <br />Rig w/ crew 2,500 gal <br />water truck truck w/ Octoplug <br />(Cirees Cut surface <br />casin <br />& <br />Hole diem. <br />length per <br />. <br />c <br />o <br />volume <br />hole lbs per cwt <br />that is 100 Cement Rig setup time Rig time to time <br /> <br />t <br />t <br />l <br />t <br />h <br />l <br />h <br />hourly rate Total rig <br />w/driver driver cost , <br />$19.67 g <br />mark Total cost <br />(in) (ft) (cf) , <br />26 (CIRCES) <br />of cement fills 1 <br />26 o <br />a <br />cos <br />per <br />o <br />e ( <br />r) fill hole (setup + <br />(CIRCES) cost <br />hourly rate (rig fill <br />per in. <br />(CIRCES <br /> . <br />. <br />of) fill) <br />(Cirees) time x <br />diam.) , <br />510.90/If) <br /> truck rate) <br />SC-SL 1 4- 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-SL 3 2 - 10 0.2 0.2 $8.78 $2 0.42 0.50 0.92 $227.07 $209 $60 $30 $39 $6 $345 <br />SC-1-1130 4- 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-HG11 41 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-HG17 4- 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-HG20 4- 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-HG26 4- 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-HG30 8.75 10 4.2 3.3 $8.78 $29 0.42 0.50 0.92 $227.07 $209 $60 $30 $171 $25 $524 <br />SC-HG44-2 4 - 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-HG44-3 4, 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-HG54 4- 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-HG56 4- 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-HG59 4- 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-TG29 4- 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-TG33 4- 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-TG46 4 - 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-TG53 4 _ 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />SC-TG56 4 - 10 0.9 0.7 $8.78 $6 0.42 0.50 0.92 $227.07 $209 $60 $30 $78 $11 $395 <br />/ Totals $129 $3,760 $1,080 $540 $1,463 $213 $7,185 <br /> <br /> Total hours 16.56 <br /> )ivided by number of rigs 1 <br /> Net total hours 16.56