My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-07_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2008-03-07_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:38 PM
Creation date
8/25/2009 1:30:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
3/7/2008
Doc Name
Revised Application
From
Blue Mountain Energy, Inc
To
DRMS
Type & Sequence
MR133
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />(L- <br />COLORADO DIVISION OF MINERALS AND GEOLOGY ?p <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567Ce`v <br />APPLICATION FORM FOR A REVISION D?v?s1O`' and SOH <br />TO A COAL MINING AND RECLAMATION PERMIT M+nm9 <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and/or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C- 1981 - 018 . Date: 2 / 29 / 2008 <br />Permittee: Blue Mountain Energy, Inc. <br />Street: 3607 CR 65 <br />City: Rangely <br />State: CO Zip Code: 81648 - <br />Brief Description of Revision: Addition of 19 nitrogen injection/sampling holes <br />Addition of nitrogen generating unit with 6900' of surface <br />pipeline. Addition of breathable air miner rescue system <br />Realignment of powerline to B-Vent Shaft #2, SH-1, and RDH-3. <br />Minor changes to structures at RDH-2, RDH-3, SH-1, SH-2, & B-Vent Shaft #2 <br />Public Notice Attached: Yes <br />Bond Increase: Yes ? No <br />Proposed Change in: <br />Permit Area - <br />Disturbed 14 <br />Permit 0 <br />Affected 0 <br />No ? . (Required for PRs and TRs) <br />Federal ? Non-Federal Mine <br />Surface Ownership - <br />15 Acres Private Land Acres <br />0 Acres Federal Land -Acres <br />0 Acres State Land -Acres <br />Mineral Ownership - <br />Mineral Private -Acres Mineral State Acres <br />Mineral Federal -Acres
The URL can be used to link to this page
Your browser does not support the video tag.