Laserfiche WebLink
CHANGES BY SECTION <br />Table of Contents <br />Master Table of Contents <br />Replace all to add III.F, correct page numbering on Section III, and add listing <br />of Map 155. <br />Section III <br />Table of Contents <br />Added reference to section III.F <br />III-27 Modify III.A.8 to discuss drill hole changes related to spontaneous combustion <br />event and nitrogen injection system. <br />III-34 Identified new footage of power line to RDH-3, SH-2, and B-Vent Shaft #2. <br />III-35 Added new section III.F to discuss Miner Rescue Infrastructure. <br />Section V <br />V-24 Make changes to Table V-3 to account for changes in disturbance acres. <br />Maas <br />Table of Contents (last page) <br />Added reference to Map 155. <br />Map 147 Added SC-xxxx holes, changed location for L"8-2, added N2 above ground <br />pipeline. <br />Map 154 Removed Coherex tank and containment, added generator and blower for <br />breathable air for miner rescue chamber. <br />Map 155 Slight modification of B-Vent Shaft #2, SH-1, SH-2 pads. Increased size of pad <br />for hoist and building. Removed steel surface liner for shaft and added hoist <br />head frame. Added RDH-3 pad showing N2 generator and associated <br />compressors. Added breathable air blower to RDH-3.