My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-03-12_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2008-03-12_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:24:56 PM
Creation date
8/25/2009 1:30:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REVISION
Doc Date
3/12/2008
Doc Name
Completeness/Decision Letter & Form
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
MR133
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o R <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />D IV IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />March 12, 2008 <br />Scott Wandstedt <br />Blue Mountain Energy, Inc <br />3607 CR 65 <br />Rangely, CO 81648 <br />Re: Deserado Mine (Permit No. C-1981-018) <br />Decision - Minor Revision No. 133 (MR-133) <br />Nitrogen Injection Holes and Road <br />Dear Mr. Wandstedt: <br />STATE OF COLORADO <br /> <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />The Division of Reclamation, Mining and Safety found your application for Minor Revision No. 133 to be <br />complete on March 12, 2008, and issued the decision on the same date. The Decision Form for Minor <br />Revision No. 133 is enclosed. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed decision form. If the amount of Bond Held <br />equals or exceeds the Revised Liability, you need not submit additional bond. However, if the Revised <br />Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that equals or <br />exceeds the Revised Liability. This Minor Revision must not be implemented until any required increase in <br />bond is submitted to and approved by the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />7-• ,-t 4r <br />Jason D. Musick <br />Environmental Protection Specialist <br />Enclosure <br />cc: Carl Johnston, Office of Surface Mining, with enclosures <br />C-MR-06_C 1981018_JDM_03122008034136.doc <br />Office of <br />Office of Active and Inactive Mines <br />Mined Land Reclamation Denver - Grand Junction - Durango
The URL can be used to link to this page
Your browser does not support the video tag.