Laserfiche WebLink
First the topsoil stockpile berm will be seeded with recommended seed by the NRCS to <br />stabilize topsoil which surrounds the whole permit area and would also contain <br />stormwater for the stormwater permit. The walls of the pit would be sloped one foot <br />horizontal, one foot vertical to prevent cave in of pit wall and safety of people and <br />workers and pit would be inspected daily (see cross section map in B 1 with letter from <br />AEG Consultants).