My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-11_PERMIT FILE - M2009038
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009038
>
2009-08-11_PERMIT FILE - M2009038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:38 PM
Creation date
8/24/2009 3:43:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009038
IBM Index Class Name
PERMIT FILE
Doc Date
8/11/2009
Doc Name
112c permit application approval
From
DRMS
To
JSC, Inc.
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : DRMS <br />04a State : Colorado <br />0811012009 County : Rio Blanco <br />THM Site : Urie Gravel Pit <br />Permit or other job action :Final Reclamation Cost Estimate <br />Task description : Spread topsoil over 15 acres <br />Permit/job # : M-2009-038 <br />Abbreviation :none <br />Filename :M038-04a <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Equipment Description <br />Scraper work team -Scraper : Cat 633E Series 2 (2001) <br />-Push dozer: NA <br />Support equipment -Load area : Cat D8R Series 11 - 8SU (2005) <br />-Dump area :NA <br />Road maintenance -Motor grader : CAT 14H <br />-Water'truck :Water Tanker, 2,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scr6per2 NA dozer NA grader misctruk <br />% Utilization-machine : 100 NA 25 NA 100 50 <br />-Ripper attachment : NA NA NA NA 10 NA <br />Ownerhip cost/hour : $80.67 NA $48.29 NA $41.81 $7.87 <br />Operating cost/hour : $122.85 NA $23.71 NA $60.64 $10.48 <br />Ripper op. cost/hour : NA NA $0.00 NA $0.00 $0.00 <br />Operator cost/hour : $30.01 NA $35.01 NA $28.49 $33.94 <br />Unit subtotals : $233.53 NA $107.02 NA $130.94 $52.29--- <br />Number of units : 2 0 1 0 1 1 <br />Group subtotals : Work : $467.06 Support: $107.02 Maintenance : $183.22 <br />Total work team cost/hour : $757.30 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 12,100 LCY factor : NA volume : 12,100 LCY <br />Source of quantity take-off :Reclamation Plan <br />Source of estimated swelffactor: NA
The URL can be used to link to this page
Your browser does not support the video tag.