My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-11_PERMIT FILE - M2009038
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009038
>
2009-08-11_PERMIT FILE - M2009038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:49:38 PM
Creation date
8/24/2009 3:43:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009038
IBM Index Class Name
PERMIT FILE
Doc Date
8/11/2009
Doc Name
112c permit application approval
From
DRMS
To
JSC, Inc.
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 2,500 Gal. $50.82 1 $50.82 $50.82 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $50.82 $50.82 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Rangely <br />Transportation Cycle Time : Non- Total one-way travel distance : 2.0 miles <br /> Roadable Roadable Average travel speed : 25.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.08 0.08 Total non-roadable mob/demob cost $4,381.46 <br />Return time (hours) = 0.08 0.08 " two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost `'" : $8.13 <br />Unloading time (hours) = 0.50 NA one round trip, no haul rig <br />Subtotals = 1.16 0.16 <br />JOB TIME AND COST Total job time : 2.32 hours <br /> Total job cost : $4,390
The URL can be used to link to this page
Your browser does not support the video tag.