Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 COLORADO <br />[ <br /> <br />Phone: (303) 866-3567 D IV IS I ON OF <br />RECLAMATION <br />FAX: (303) 832-8106 MINING <br />August 20, 2009 SAFETY <br />Steve Leach Bill Ritter, Jr. <br />Chevron Mining, Inc Governor <br />116 Inverness Drive East, Suite 207 Harris D. Sherman <br />Executive Director <br />Englewood, CO 80203-2273 Ronald W. Cattany <br />Division Director <br />RE: Edna Strip Mine (Permit No. C-80-001) Natural Resource Trustee <br />Proposed Decision - Technical Revision No. 48 (TR-48) <br />Terminate Water Monitoring <br />Dear Mr. Leach, <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision for <br />Technical Revision No. 48 at the Edna Strip Mine. Notice of the proposed decision will be published <br />in the Steamboat Pilot as soon as possible. The first publication will initiate the ten (10) day public <br />comment period for the Division's decision. <br />Please note that, although this proposed decision represents the Division's decision to terminate water <br />monitoring in terms of what the Division requires, this proposed decision does not terminate the <br />requirements under the CPDES permit at the Edna Strip Mine. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The <br />material should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount <br />of Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, <br />if the Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing <br />bond that equals or exceeds revised liability. This Technical Revision must not be implemented until <br />this proposed decision becomes final and until any required increase in bond is submitted to and <br />approved by the Division. <br />If you have any questions feel free to contact me. <br />&Sinc?erely, <br />`Jason Mu <br />Environmental Protection Specialist <br />Enclosure <br />Cc: Carl Johnston, Office of Surface Mining, with enclosures <br />Office of <br />Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines