Laserfiche WebLink
Reclamation Success <br />SL-10 - In terms of meeting the criteria for Phase I, II and III bond release, the reclaimed areas at the <br />Edna Mine were acceptable with the exception of the above mentioned maintenance and repair <br />issues. Reclamation, in terms of backfilling, grading, and revegetation success, was great at the time <br />of the inspection. <br />SL-11 - The overall condition of the Phase II and III bond release reclamation was good. The <br />reclamation areas showed good vegetation cover with no excessive invasive or noxious vegetation <br />within the parcels. Other than the noted weed management issues noted above, the reclamation <br />areas had no major problems with damage or erosion at the time of the inspection. <br />Based on the inspection, SL-10 and SL-11 will require the above referenced maintenance issues to <br />be address before a proposed decision can be made.