My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-19_REVISION - M1987049
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987049
>
2009-08-19_REVISION - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:06:02 PM
Creation date
8/20/2009 1:09:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REVISION
Doc Date
8/19/2009
Doc Name
Adequacy Review Response
From
Hart Environmental
To
DRMS
Type & Sequence
AM2
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNITED POWER, INC. <br />CONSTRUCTION STANDARD <br />MINING ACTIVITIES ADJACENT TO ELECTRIC <br />POWER LINES <br />In order to comply with applicable codes and regulations and United Power, Inc. safety <br />and operational requirements, mining activities must maintain a minimum of 10' radial <br />clearance from all overhead and underground electric power lines. <br />No mining excavation shall be allowed within a minimum of 10' of any overhead or under- <br />ground electric power line paralleling a public road or highway or other permanent access. <br />Existing grade must be maintained for a minimum of 10' from the electric power line; from <br />that point, a minimum 3:1 slope shall extend to a distance of at least 35' from the top of the <br />excavation. <br />No mining excavation shall be allowed within a minimum of 35' of either side of any over- <br />head or underground electric power line with mining activities on both sides of the line. No <br />excavation shall be allowed within a minimum of 20' of the point that any overhead electric <br />power line guy wire anchor rod enters the ground. <br />Continuous all weather access must be provided to and parallel to all electric power lines <br />within the area of excavation. A 70' wide corridor, 35' on either side of the electric power <br />line, shall be maintained to allow access to United Power, Inc. to overhead electric power <br />poles and lines and to underground electric system facilities. <br />The intent of this Policy is to ensure the integrity of the electric power line and provide for <br />all weather access to the line for maintenance. <br />All requests for variance to the Standard shall be subject to review and approval of the <br />United Power, Inc. Safety Director. <br />Standard mining adjawnt to fines <br />A Waras 7,20"
The URL can be used to link to this page
Your browser does not support the video tag.