Laserfiche WebLink
Air% <br />amec <br />Earth 8 Environmental <br />ATTACHMENT A <br />2009 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name AUG-2 AUG-3 AUG-4 AUG-5 AUG-6 AUG-7 AUG-8 <br />Joe Hickey - PR PR PR PR PR - <br />Steve Rice - LS LS LS LS LS - <br />Steve Marquez - ST ST ST ST ST - <br />-Tyler Wendlandt - - - - - - - <br />John Lupo - - - - - - - <br />Derek Wittwer - - - - - - <br />* Night Shift, CQA (no night shift at this time) <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />VLF Weekly Report WE 08.08.09.D.doc