My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-17_REPORT - M1980244
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-08-17_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:22 PM
Creation date
8/18/2009 1:14:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/17/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Report- 8/2/2009
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amen <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Work Element: Phase 5 CQA/ VLF <br />Date: August 8, 2009 <br />Reporting Period: 08/02/09 through 08/08/09 <br />Days S M T WI T F S <br />Work Shifts - D D D D D - <br /> <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 49°F to 56°F (+/-) High: 76°F to 82T (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No delays due to weather. Ames has suspended night shift construction activities for this <br />week. Night shift will resume Monday, 8/10/2009. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />Tree removal from the east slope of the Phase 5 VLF footprint continued using a CAT 345 <br />excavator and 40-ton articulating haul trucks. The removed trees and slash were placed in the <br />Dump 4 slash stockpile. <br />B) Stripping <br />1) VLF <br />Stripping of vegetation and topsoil was performed between station J15+50 (+/-) and J18+00 <br />(+/-), approximately 40 to 200 feet right of centerline, using a CAT D-8 dozer pushing the <br />removed material west. <br />C) Topsoil Relocation <br />1) VLF <br />No work performed during the week. <br />D) Subgrade Preparation <br />1) VLF <br />Subgrade preparation was performed between stations 175+00 (+/-) and F10+00 (+/-), <br />approximately 0 to 300 feet left of centerline. A CAT D-8 dozer was used to rip the subgrade <br />VLF Weekly Report WE 08.08.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.