Laserfiche WebLink
<br />Table 5 <br />Future Depletions and Replacement Schedule <br />Loveland Ready - Mix Concrete, Inc. - Bokelman / Walters Pit <br />(All Values in Acre-Feet) <br /> <br />Month Future Depletions <br />Net Evaporation Production <br />[1] [2] <br />Total <br />[3] Lagged Future Depletions <br />Net Evaporation Production <br />[4] [5] <br />Total <br />[6] City of Loveland <br />Replacement Schedule <br />[7] <br />September 0.04 0.59 0.63 0.04 0.59 0.63 0.64 <br />October 0.03 0.56 0.59 0.03 0.57 0.60 0.61 <br />November 0.01 0.58 0.60 0.02 0.58 0.60 0.61 <br />December 0.01 0.38 0.39 0.01 0.43 0.44 0.45 <br />January 0.01 0.24 0.25 0.01 0.28 0.29 0.30 <br />February 0.01 0.29 0.31 0.01 0.28 0.30 0.30 <br />March 0.02 0.41 0.43 0.02 0.38 0.40 0.40 <br />April 0.03 0.57 0.60 0.03 0.53 0.55 0.56 <br />May 0.04 0.56 0.59 0.03 0.56 0.59 0.60 <br />June 0.06 0.56 0.62 0.05 0.56 0.61 0.62 <br />July 0.06 0.55 0.62 0.06 0.56 0.62 0.63 <br />August 0.06 0.59 0.65 0.06 0.58 0.64 0.65 <br />Total: 0.37 5.89 6.26 0.37 5.89 6.27 6.38 <br />Notes: <br />[1] Equal to Table 2, Column 6. <br />[2] Equal to Table 4, Column 5. <br />[3] [1]+[2]. <br />[4] and [5] based on the following lagging factors: Month 1 = 73.3%, Month 2 = 23.6%, Month 3 = 2.8% and Month 4 = 0.4%. <br />[6] [4]+[5] <br />[7] Equal to [6] + 1.8% transit loss * [3]. Release of the City of Loveland's water at the W.C.'s Discretion. <br />Bishop-Brogden Associates, Inc. File:Table 5.xls