Laserfiche WebLink
• <br />• <br />Seneca Coal Company, LLC <br />Seneca II-W Mine <br />Phase I Bond Release Request <br />III. IDENTIFICATION OF LANDS <br />April2009 <br />The Seneca II-W Mine is located approximately seven (7) miles south of the Town of Hayden, <br />Colorado off of Routt County Road 53. The USGS 7.5 Minute Quadrangle Maps of Hayden Gulch, <br />Hayden, Dunckley, and Mt. Harris, contain the described permit area. The permitted area, <br />including the mine area and the Tie-Across Haul Road, which connects Routt County Road 53 with <br />the Hayden Station Power Plant, is approximately 4,093 acres. The permitted disturbed area <br />contains 1,381.5 acres of which 1,284.9 acres are within the mine area and the remaining 96.6 acres <br />are associated with the Tie-Across Haul Road corridor. Surface ownership is predominately private, <br />with right of entry based on a variety of private leases, subleases and easements. The permit area <br />also includes limited areas of state controlled surface. <br />The specific area to which this bond release request applies is included within the Permit Area <br />described as follows: <br />TSN, R88W (Mine Area) <br />Section 9: Portions of SE'/4NE'/4, NE'/4SE'/4, and W'/2NE'/4 <br />Section 10: S'/2S'/2NW'/4, SW A, SE'/4, Portions of S'/2NE'/4 <br />Section 11: Portions of S'/2S'/2 SW1/4 <br />Section 14: Portions of SW1/4, NW A, and S'/2S'/2SE'/4 <br />Section 15: All <br />Section 16: Portions of W'/2NW'/4, SE'/4NW'/4, NE'/4SW'/4, and SE'/4 <br />Section 21: Portions of E'/2NE'/4 <br />Section 22: NW A, NE'/4, N'/2SE'/4 , SW'/4SE'/4, Portions of N'/2SW'/4, and <br /> SW'/4SE'/4 <br />Section 23: NW'/4, SW'/4, W'/20/2, and W'/2E'/2E'/2 <br />Section 26: W'/2, W'/20/2, and Portions of W'/2E'/2NE'A and W'/2E'/2SE'/4 <br />Section 27: E'/2 <br />Section 34: NE'/4, N'/2SE'/4, and Portions of N'/2S'/2SE'/4 <br />Section 35: NW1/4, W'/2NE'/4, N'/2SW'/4 and Portions of N'/2S'/2 SW'/4, <br /> NW'/4SE'/4, NW'/4SW'/4SE'/4, NW'/4NE'/4SE'/4, and W'/2E'/2NE'/4 <br />T6N. R88W (Tie Across Haul Road) <br />Section 14: Portions of SE1/4, SW1/4 <br />Section 23: Portions of N1/2 <br />Section 24: Portions of NE'/4, NW1/4 <br />T6N, R87W (Tie Across Haul Road) <br />Section 17: Portions of SW'/4, SE'/4, NE'/4 <br />Section 18: Portions of SEA <br />Section 19: Portions of N/2 <br />All west of the 6th Principal Meridian; totaling approximately 4,093.0 acres. <br />The exact location of the bond release area is shown on Exhibit A - Phase I Bond Request Areas. <br />2