<br />•
<br />Seneca Coal Company, LLC
<br />Seneca II-W Mine
<br />Phase I Bond Release Request
<br />III. IDENTIFICATION OF LANDS
<br />April2009
<br />The Seneca II-W Mine is located approximately seven (7) miles south of the Town of Hayden,
<br />Colorado off of Routt County Road 53. The USGS 7.5 Minute Quadrangle Maps of Hayden Gulch,
<br />Hayden, Dunckley, and Mt. Harris, contain the described permit area. The permitted area,
<br />including the mine area and the Tie-Across Haul Road, which connects Routt County Road 53 with
<br />the Hayden Station Power Plant, is approximately 4,093 acres. The permitted disturbed area
<br />contains 1,381.5 acres of which 1,284.9 acres are within the mine area and the remaining 96.6 acres
<br />are associated with the Tie-Across Haul Road corridor. Surface ownership is predominately private,
<br />with right of entry based on a variety of private leases, subleases and easements. The permit area
<br />also includes limited areas of state controlled surface.
<br />The specific area to which this bond release request applies is included within the Permit Area
<br />described as follows:
<br />TSN, R88W (Mine Area)
<br />Section 9: Portions of SE'/4NE'/4, NE'/4SE'/4, and W'/2NE'/4
<br />Section 10: S'/2S'/2NW'/4, SW A, SE'/4, Portions of S'/2NE'/4
<br />Section 11: Portions of S'/2S'/2 SW1/4
<br />Section 14: Portions of SW1/4, NW A, and S'/2S'/2SE'/4
<br />Section 15: All
<br />Section 16: Portions of W'/2NW'/4, SE'/4NW'/4, NE'/4SW'/4, and SE'/4
<br />Section 21: Portions of E'/2NE'/4
<br />Section 22: NW A, NE'/4, N'/2SE'/4 , SW'/4SE'/4, Portions of N'/2SW'/4, and
<br /> SW'/4SE'/4
<br />Section 23: NW'/4, SW'/4, W'/20/2, and W'/2E'/2E'/2
<br />Section 26: W'/2, W'/20/2, and Portions of W'/2E'/2NE'A and W'/2E'/2SE'/4
<br />Section 27: E'/2
<br />Section 34: NE'/4, N'/2SE'/4, and Portions of N'/2S'/2SE'/4
<br />Section 35: NW1/4, W'/2NE'/4, N'/2SW'/4 and Portions of N'/2S'/2 SW'/4,
<br /> NW'/4SE'/4, NW'/4SW'/4SE'/4, NW'/4NE'/4SE'/4, and W'/2E'/2NE'/4
<br />T6N. R88W (Tie Across Haul Road)
<br />Section 14: Portions of SE1/4, SW1/4
<br />Section 23: Portions of N1/2
<br />Section 24: Portions of NE'/4, NW1/4
<br />T6N, R87W (Tie Across Haul Road)
<br />Section 17: Portions of SW'/4, SE'/4, NE'/4
<br />Section 18: Portions of SEA
<br />Section 19: Portions of N/2
<br />All west of the 6th Principal Meridian; totaling approximately 4,093.0 acres.
<br />The exact location of the bond release area is shown on Exhibit A - Phase I Bond Request Areas.
<br />2
|