Laserfiche WebLink
,S'enew ll-W,tlare Phase 1 Bond Release <br />I'Ige 2 <br />4P Section 22: <br />Section 23 NW''., N1! :, N' 2SE:' . , SW <br />' :SF, 4 Portions of and SW' <br />',SE!/ <br />' <br />' <br /> <br />: , <br />. <br />NW <br />.%., SV4 <br />'4, W'.'2E?';2, and W' 2E'',E1,12 <br /> Section 26: <br />S <br />i ky7`2, W`2E',2, and Portions of <br />NE;!: and YY'"2 E:' 2SE?'% <br /> <br />ect <br />on 37: . <br />F?':2 <br /> Section 34: NE'.'., N'/,SE'/., and Portions of N' 0'2SE' <br />' <br /> <br />Section 35: , <br />4 <br />NVG''/., W' :NE'%, N' 2SW',-'. and Portions of N'.' S!, SVG'' : <br /> , <br />N\YV1'4SE','4, NlC11.'4S%V '+SE''•, NXV' :NE! 4SE' J, and %XV 21:' 2NF'. <br /> 1'6N. RH8W Tie Across I laul Road <br /> Section 14: Portions of SE' <br />/. <br />SW' <br />: <br /> Section 23: . <br />, <br />, <br />Portions of N'i2 <br /> Section 24: Portions of NE` 4 <br />NYY'';4 <br /> , <br /> !& R87W <br />Section 17: Tie Across Efa ,1 Road <br />Portions of SW'/., SE'/. <br />NE'/. <br /> Section 18: , <br />Portions of SE','. <br /> Section 19: Portions ofNS2 <br />(!be bond ukase arra doer hot inelade airy of the Tie- ,,mss f-faml Road cnrrrdor, orrly sele,t a.7ts Awthi# the mine arts) <br />All located west of the 6th Principal Meridian; totaling 4,093 acres. The USGS 7.5 Minute (quadrangle Maps <br />of Hayden Gulch, Hayden, Dunckley, and Mt. Harris, contain the described permit area. <br />SCC is applying for phase I release on 1,166.2 acres. A reclamation bond in the amount of $11,117,348 is <br />currently in place of which $4,864,928 are being requested for release. <br />Pursuant to Rule 3.03.1, a permittee may request Phase I Bond release upon successful completion of <br />backfilling, regrading and drainage control in accordance with the approved reclamation plan. For the <br />purposes of this Phase I Bond Release request, the term "reclaimed" means those disturbed/mined areas <br />where successful completion of backfilling, regrading and drainage control, in accordance with the approved <br />reclamation plan, has been completed. The areas requested for bond release were backfilled and graded from <br />the beginning of mining, in 1990 through 2008 in accordance with the Colorado Division of Reclamation, <br />Mining and Safety (CDRMIS) rules and regulations. <br />The Phase I reclamation activities have produced a stable landform in compliance with the approved <br />conditions in the (;URNS Permit No. (:-82 057 The majority of the grading work was performed with <br />dozers and scrapers. In some cases the major backfilling was done with draglines. All areas affected by the <br />surface mining operations, except as specifically exempted by the CAMS, were regraded on a timely basis to <br />a stable configuration that conforms to the approved post-mine land use (livestock grazing and wildlife <br />habitat). Rill and gully surveys are conducted annually in the spring of each year to identify areas that have <br />experienced severe erosion or other signs of instability during spring runoff from snowmelt and precipitation