,S'enew ll-W,tlare Phase 1 Bond Release
<br />I'Ige 2
<br />4P Section 22:
<br />Section 23 NW''., N1! :, N' 2SE:' . , SW
<br />' :SF, 4 Portions of and SW'
<br />',SE!/
<br />'
<br />'
<br />
<br />: ,
<br />.
<br />NW
<br />.%., SV4
<br />'4, W'.'2E?';2, and W' 2E'',E1,12
<br /> Section 26:
<br />S
<br />i ky7`2, W`2E',2, and Portions of
<br />NE;!: and YY'"2 E:' 2SE?'%
<br />
<br />ect
<br />on 37: .
<br />F?':2
<br /> Section 34: NE'.'., N'/,SE'/., and Portions of N' 0'2SE'
<br />'
<br />
<br />Section 35: ,
<br />4
<br />NVG''/., W' :NE'%, N' 2SW',-'. and Portions of N'.' S!, SVG'' :
<br /> ,
<br />N\YV1'4SE','4, NlC11.'4S%V '+SE''•, NXV' :NE! 4SE' J, and %XV 21:' 2NF'.
<br /> 1'6N. RH8W Tie Across I laul Road
<br /> Section 14: Portions of SE'
<br />/.
<br />SW'
<br />:
<br /> Section 23: .
<br />,
<br />,
<br />Portions of N'i2
<br /> Section 24: Portions of NE` 4
<br />NYY'';4
<br /> ,
<br /> !& R87W
<br />Section 17: Tie Across Efa ,1 Road
<br />Portions of SW'/., SE'/.
<br />NE'/.
<br /> Section 18: ,
<br />Portions of SE','.
<br /> Section 19: Portions ofNS2
<br />(!be bond ukase arra doer hot inelade airy of the Tie- ,,mss f-faml Road cnrrrdor, orrly sele,t a.7ts Awthi# the mine arts)
<br />All located west of the 6th Principal Meridian; totaling 4,093 acres. The USGS 7.5 Minute (quadrangle Maps
<br />of Hayden Gulch, Hayden, Dunckley, and Mt. Harris, contain the described permit area.
<br />SCC is applying for phase I release on 1,166.2 acres. A reclamation bond in the amount of $11,117,348 is
<br />currently in place of which $4,864,928 are being requested for release.
<br />Pursuant to Rule 3.03.1, a permittee may request Phase I Bond release upon successful completion of
<br />backfilling, regrading and drainage control in accordance with the approved reclamation plan. For the
<br />purposes of this Phase I Bond Release request, the term "reclaimed" means those disturbed/mined areas
<br />where successful completion of backfilling, regrading and drainage control, in accordance with the approved
<br />reclamation plan, has been completed. The areas requested for bond release were backfilled and graded from
<br />the beginning of mining, in 1990 through 2008 in accordance with the Colorado Division of Reclamation,
<br />Mining and Safety (CDRMIS) rules and regulations.
<br />The Phase I reclamation activities have produced a stable landform in compliance with the approved
<br />conditions in the (;URNS Permit No. (:-82 057 The majority of the grading work was performed with
<br />dozers and scrapers. In some cases the major backfilling was done with draglines. All areas affected by the
<br />surface mining operations, except as specifically exempted by the CAMS, were regraded on a timely basis to
<br />a stable configuration that conforms to the approved post-mine land use (livestock grazing and wildlife
<br />habitat). Rill and gully surveys are conducted annually in the spring of each year to identify areas that have
<br />experienced severe erosion or other signs of instability during spring runoff from snowmelt and precipitation
|