Seneca 11-W'ilfine Phase I Bond Release
<br />Pipe 2
<br />Section 22:
<br />Section 23:
<br />Section 26:
<br />Section 27:
<br />Section 34:
<br />Section 35:
<br />'I'6N. R88W
<br />Section 14:
<br />Section 23:
<br />Section 24:
<br />T6N_ R87W
<br />Section 17:
<br />Section 18:
<br />Section 19:
<br />NW/4, NF/4, N'./2SE'/, , SW' /4SE'/,, Portions of N'/zSW'/,, and SW'/.SE'/,
<br />NW',/4, SW'/4, W/2E'/2, and W'/2E'/2E',/2
<br />W!/z, W/2E'/2, and Portions of W`/2E_"/2N E'/, and W/ F'i,_SE1/i
<br />1",'i z
<br />NE'/., N!/:!SE'/,, and Portions of W/2SV2SE!/,
<br />NW'/4, W1 .,2NEI/4, N'/zSW'/. and Portions of W 2S'/2SW7/.,
<br />NW', 4SE',/4, NkV/4SW1/'$SF.',/., N%X`/,W/4SE!/4, and ky.",'., E!/2NE'/4
<br />'Fie Across I1a . Road
<br />portions of SE'/4, SW'/4
<br />Portions of N'/z
<br />Portions of NE',/4, NW'4
<br />Tie Across Ha cl Road
<br />Portions of SW/4, SE'/4, NE'/4
<br />Portions of SE'/,
<br />Portions of N'/4
<br />(The bond release arra does not include any of the Tie _,1,7vrs Haul Road enmdor, only select acrrr within the mine area.)
<br />All located west of the 6th Principal Meridian; totaling 4,093 acres. The USGS 7.5 Minute Quadrangle Maps
<br />of Hayden Gulch, Hayden, Dunckley, and Mt. Harris, contain the described permit area.
<br />SCC is applying for Phase I release on 1,166.2 acres. A reclamation bond in the amount of $11,117,348 is
<br />currendy in place of which $4,864,928 are being requested for release.
<br />Pursuant to Rule 3.03.1, a permittee may request Phase I Bond release upon successful completion of
<br />backfmlling, regrading and drainage control in accordance with the approved reclamation plan. For the
<br />purposes of this Phase I Bond Release request, the term "reclaimed" means those disturbed/mined areas
<br />where successful completion of backfilling, regrading and drainage control, in accordance with the approved
<br />reclamation plan, has been completed. The areas requested for bond release were backfilled and graded from
<br />the beginning of mining, in 1990 through 2008 in accordance with the Colorado Division of Reclamation,
<br />Mining and Safety (CDRMS) rules and regulations.
<br />The Phase 1 reclamation activities have produced a stable landform in compliance with the approved
<br />conditions in the CDR?%fS Permit No. C-82-057. The majority of the grading work was performed with
<br />dozers and scrapers. In some cases the major backfmlling was done with draghnes. A_11 areas affected by the
<br />surface mining operations, except as specifically exempted by the CDRAIS, were regraded on a timely basis to
<br />a stable configuration that conforms to the approved post-mine land use (livestock grazing and wildlife
<br />habitat). Rill and gully surveys are conducted annually in the spring of each year to identify areas that have
<br />experienced severe erosion or other signs of instability during spring runoff from snowmelt and precipitation
|