Laserfiche WebLink
.S'eneca 11-11=',ttine Phase I Bond Release <br />l' iqe 2 <br />1 <br />Section 22: <br />Section 23: <br />Section 26: <br />Section 27: <br />Section 34: <br />Section 35: <br />T6N_ R88W <br />Section 14: <br />Section 23: <br />Section 24: <br />UCl_$w <br />Section 17: <br />Section 18: <br />Section 19: <br />NW'/4, NE',/4, N';iSE'/4 , SW'/.SE'/., Portions of N'/2SW'/4, and SW'/4SE1/4 <br />N W'/4, S W'/4, W,/2F/2, and W'/ 2 E'/z E:'/z <br />W'/z, W/2 E/2, and Portions of W','2F_,',/2NE!/4 and W',/2E'/2SE!% <br />E:' /2 <br />NE!4, N'/2SE!/4, and Portions of N'/O/' SE!/4 <br />NW'/4, W'/2NE'/4, NV2SW 4 and Portions of N' 2S'/2SW14, <br />NW!/,4SE'.%, NkrV'/,4SWI/4SE';'., NW1...'4NE!/4SE!/4, and W 20,'AE'l4 <br />Tie Across Haul Road <br />Portions of SE'/4, SW'/4 <br />Portions of NV2 <br />Portions of NE'./4, NW';: <br />'l'ie Across !-Ia ,1 Road <br />Portions of SW'/4, SE'/., NE'/. <br />Portions of SE'/4 <br />Portions of N'/2 <br />(I be bond releare arza doer not inclade any of the Tie-Agmsr Haul Road cnmdor, only select acres =thin the mine ana) <br />All located west of the 6th Principal Meridian; totaling 4,093 acres. The USGS 7.5 Minute Quadrangle Maps <br />of Hayden Gulch, Hayden, Dunckley, and Mt. Harris, contain the described permit area. <br />SCC is applying for Phase I release on 1,166.2 acres. A reclamation bond in the amount of $11,117,348 is <br />currently in place of which $4,864,928 are being requested for release. <br />Pursuant to Rule 3.03.1, a permittee may request Phase I Bond release upon successful completion of <br />backfilling, regrading and drainage control in accordance with the approved reclamation plan. For the <br />purposes of this Phase I Bond Release request, the term "reclaimed" means those disturbed/mined areas <br />where successful completion of backfilling, regrading and drainage control, in accordance with the approved <br />reclamation plan, has been completed. The areas requested for bond release were backfilled and graded from <br />the beginning of mining, in 1990 through 2008 in accordance with the Colorado Division of Reclamation, <br />Mining and Safety (CDRNIS) rules and regulations. <br />The Phase I reclamation activities have produced a stable landform in compliance with the approved <br />conditions in the CDRMS Permit No. C-82-057. The majority of the grading work was performed with <br />dozers and scrapers. In some cases the major backfilling was done with draglines. All areas affected by the <br />surface mining operations, except as specifically exempted by the CDRAfS, were regraded on a timely basis to <br />a stable configuration that conforms to the approved post-mine land use (livestock grazing and wildlife <br />habitat). Rill and gully surveys are conducted annually in the spring of each year to identify areas that have <br />experienced severe erosion or other signs of instability during spring runoff from snowmelt and precipitation