.Seneca H- 1Y Atine Phase I Bond Release
<br />l' 1ge 2
<br />I?
<br />Section 22:
<br />NW'./,, NF.,'/., N'/ZSE'/, , SW'./.SE'/., Portions of N! SSW'/.
<br />and SW'/
<br />SE'/
<br />
<br />Section 23. ,
<br />,
<br />,
<br />NW'/4, SW'/4, W/-2E/2, and W'/2E'/2E'/2
<br /> Section 26: W'/z, W/2E'/2, and Portions of W'/zE!'zNE'/. and W zE'hSF
<br />'%,
<br /> Section 27: ,
<br />E'/z
<br /> Section 34: NE'/,, N1/2SE'/4, and Portions of N"2S'/2SE'/4
<br /> Section 35: NW'/,, W'/2NE1/4, N'/2SW'/4 and Portions of N,,2S'/2SW','4
<br /> ,
<br />NW/,SE',/4, NW;'+SW! 4SF.!'4, NXr",-:NE'.:SE',i,, and %V 2E.,2NE',:
<br /> 16N_ R88W Tie Across Haul Road
<br /> Section 14: Portions of SE'/,, SW','.
<br /> Section 23: Portions of N'/z
<br /> Section 24: Portions of NE';:, NWT'//4
<br /> TON, R87W Tie Across IIa I Road
<br /> Section 17: Portions of SW /4, SE'/,, NE'/.
<br /> Section 18: Portions of SE'/,
<br /> Section 19: Portions of NV2
<br />(The bond release urea doer not inclmde any of the Tie -Atmxx Ham/ Road comdor, only select aces within the mine area)
<br />All located west of the 6th Principal Meridian; totaling 4,093 acres. The USGS 7.5 Minute Quadrangle Maps
<br />of Hayden Gulch, Hayden, Dunckley, and Mt. Harris, contain the described permit area.
<br />SCC is applying for Phase I release on 1,166.2 acres. A reclamation bond in the amount of $11,117,348 is
<br />currently in place of which $4,864,928 are being requested for release.
<br />Pursuant to Rule 3.03.1, a permittee may request Phase I Bond release upon successful completion of
<br />backfilling, regrading and drainage control in accordance with the approved reclamation plan. For the
<br />purposes of this Phase I Bond Release request, the term "reclaimed" means those disturbed/mined areas
<br />where successful completion of backfilling, regrading and drainage control, in accordance with the approved
<br />reclamation plan, has been completed. The areas requested for bond release were backfilled and graded from
<br />the beginning of reining, in 1990 through 2008 in accordance with the Colorado Division of Reclamation,
<br />Mining and Safety (CDRNIS) rules and regulations.
<br />The Phase I reclamation activities have produced a stable landform in compliance with the approved
<br />conditions in the CDRAIS Permit No. C-82-057. The majority of the grading work was performed with
<br />dozers and scrapers. In some cases the major backfilling was done with draglines. All areas affected by the
<br />surface mining operations, except as specifically exempted by the CDRAIS, were regraded on a timely basis to
<br />a stable configuration that conforms to the approved post-mine land use (livestock grazing and wildlife
<br />habitat). Rill and gully surveys are conducted annually in the spring of each year to identify areas that have
<br />16 experienced severe erosion or other signs of instability during spring runoff from snowmelt and precipitation
|