.Venecu Il-W" Mine Phase 1 Bond Releure
<br />1 urge 2
<br />14P Section 22:
<br />Section 23:
<br />Section 26:
<br />Section 27:
<br />Section 34:
<br />Section 35:
<br />kN_ R88W
<br />Section 14:
<br />Section 23:
<br />Section 24:
<br />T6N_R87W
<br />Section 17:
<br />Section 18:
<br />Section 19:
<br />NW'/e, NE'/., N!'?SE'.i, , SW'/,SF!4, Portions of N',/2SW'/4, and SW',/,SE'/4
<br />N W/4, SW/., WI/2E'/2, and W'/z E''z E'/2
<br />W',/z, W/2 E/2, and Portions of W'/2E1;12NE!/4 and W'/ E'izSE''a
<br />E'=
<br />NE'./., N'/2SE'/4, and Portions of NV2S';'2SF'/.
<br />NW!/., W1/2NEV/, N!'2SW'/, and Portions of N','2S'/2SW'/4,
<br />NW'/.SE',/s, N\V?4SW,,4SEIA, N\YV;4NE'/4SE'/4, and \V2E''2NE'/4
<br />Tie Across Lb Road
<br />Portions of SE'/., SW'/.
<br />Portions of N'/z
<br />Portions of NE'/,, NWI
<br />Tie Across Ha URoad
<br />Portions of SW'/., SE'/., NE'/.
<br />Portions of SF/4
<br />Portions of N'/2
<br />(I be bond releare orru doer not inclrede an
<br />.y of the Tie,Atmu Haml Road tvmdor, only select uenr within the mine arra)
<br />All located west of the 6th Principal Meridian; totaling 4,093 acres. The USGS 7.5 Minute Quadrangle Maps
<br />of Hayden Gulch, Hayden, Dunckley, and Mt. Harris, contain the described permit area.
<br />SCC is applying for Phase I release on 1,166.2 acres. A reclamation bond in the amount of $11,117,348 is
<br />currently in place of which $4,864,928 are being requested for release.
<br />Pursuant to Rule 3.03.1, a permittee may request Phase I Bond release upon successful completion of
<br />backfilling, regrading and drainage control in accordance with the approved reclamation plan. For the
<br />purposes of this Phase I Bond Release request, the term "reclaimed" means those disturbed/mined areas
<br />where successful completion of backfilling, regrading and drainage control, in accordance with the approved
<br />reclamation plan, has been completed. The areas requested for bond release were backfilled and graded from
<br />the beginning of mining, in 1990 through 2008 in accordance with the Colorado Division of Reclamation,
<br />Mining and Safety (CDRMS) rules and regulations.
<br />The Phase I reclamation activities have produced a stable landform in compliance with the approved
<br />conditions in the CDRMS Permit No. C-82-057. The majority of the grading work was performed with
<br />dozers and scrapers. In some cases the major backfilling was done with dragbnes. All areas affected by the
<br />surface mining operations, except as specifically exempted by the CDRL%IS, were regraded on a timely basis to
<br />a stable configuration that conforms to the approved post-mine land use (livestock grazing and wildlife
<br />habitat). Rill and gully surveys are conducted annually in the spring of each year to identify areas that have
<br />experienced severe erosion or other signs of instability during spring runoff from snowmelt and precipitation
|